Completed

Century Ply Boards India Ltd

1 Construction of Shed 2015-16
2 Construction of Office Building at Century Plyboards (India) Limited, Chinnaobulapuram 2015-16
4 Machine foundation 2015-16
5 Laying of interlocking tiles 2016-17
6 Dismantling removal of asbestos sheet and relaying with PPGL sheet at Hot press shed 2016-17
7 Construction of flake shed 2016-17
8 Construction of electrical control panel room at 16′  height special roof with electrical trench including electrical fittings 2016-17
9 Construction of moving floor shed upto a height of 6 mtrs including material 2016-17
10 Construction of EB Cable trench 2016-17
11 Construction of Mill machine shed 2016-17
12 Machinery foundation work 2016-17
13 Work at Wood Grabber machine 2016-17
14 Construction of testing lab with Alu partition 2016-17
15 Construction of weigh bridge with material 2016-17
16 Construction of drain inside the factory premises with material 2016-17
17 Construction of road within the factory premises (Only Labour charges, Supply of steel and Kerbsotne) 2016-17
18 Construction of PEB extension shed inside factory premises with material 2017-18
19 Construction of peeling shed 2017-18
20 Laying of paver block for the stock yard near quarters 2017-18
21 Laying of concerete platform lI for the stock yard near labour quarters 2017-18
22 Laying of concerete platform for the stock yard for peeling shed 2017-18
23 Laying of pile foundation, machinery foundation and other works for Energy Plant 2018-19
24 Laying of fuel conveyors, paver block laying work, moving floor and inter locking tiles works for Energy Plant 2019-20
25 Construction of vehicle shed and other miscellaneous work 2019-20
26 Construction of 2 nos.puff insulated labour quarters (G+1) 2020-21
27 Modification of old shed at unit-2 Boiler Area 2021-22
28 Extension of unit-2 shed upto New Energy Plant 2021-22
29 Constructions of shed between gate No: 6 & 7 2021-22
30 Extension of unit-2 shed east side 2021-22
31 Construction of 1 No puff insulated labour quarter (G+1) 2021-22
32 Modifications of old shed at unit -2 boiler area at CPIL 2021-22
33 Construction of puff insulated labour quarters 2021-22
34 Construction of PEB shed with mezzaine floor at CPIL- extension of Unit-II 2022-23
35 Construction of PEB shed with mezzaine floor at CPIL- extension of Unit-II 2022-23
36 Construction of 8 mtr. wide RCC road at rear side for 500 mtrs. 2022-23
37 Construction of storm drain for 500 mtrs. 2022-23
38 Extension of 3rd and 4th floor to the existing double bed room flat – as per spec. 2022-23
39 Construction of puff insulated labour quarters (G+1) 2022-23
40 Construction of admin building extension 2022-23
41 Construction of loading bay – extension 2022-23

Southern Railway - Signal & Telecom

1 Trenching,laying of permannantly solid lubricated HDPE pipe, jointing  backfilling, blowing/ drawing OFC cable inside permanently solid lubricated HDPE pipe, terminating OFC and 6 Quad cable in Melmaruvattur- Tindivam Section of Chennai  Division of Southern Railway 2009-10
2 Trenching, laying   jointing, backfilling, terminating OFC and 6 Quad cable in  Chennai Central – Tiruninravur Section of Chennai  Division of Southern Railway 2010-2011
3 Trenching, laying   jointing, backfilling, terminating OFC and 6 Quad cable and installation of  DTMF  equipments in  TMV-VM  Section of Chennai  Division of Southern Railway 2010-11
4 Trenching,laying of permannantly solid lubricated HDPE pipe, jointing, backfilling, blowing/ drawing ofc cable inside permanently solid lubricated HDPE pipe, terminating with FMS and testing of OFC cable in Thanjavur Jn – Mayaladuturai Jn Section Tiruchchirappalli Division of Southern Railway 2016-17
5 Supply, installation, integration, testing, commissioning of SDH and PD MUX with power supply arrangements & laying, termination, testing of OFC and 6 Quad cables in connection with 3rd line Gauge Conversion work in Tambaram –  Chengalpattu  section of Chennai Division in Southern Railway 2020-21
6 S&T portion of work – Provision of Telecom arrangements for End to End OFC in MAS-GDR section in connection with Chennai division – replacement of obsolete SCADA traction system 2021-22
7 Telecom left over works in Karaikudi – Thiruvarur section and restoration of telecom gears available in between PKT-KKDI section due to GAJA cyclone in Tiruchchirappalli Division in connection with Karaikudi-Thiruvarur Gauge Conversion work. 2021-22

Railtel Chennai - Electrical

1 Electrical works 2015-16

IIT- Chennai

Construction of additional rooms for doctors in ground floor and extension of in patients ward at 1st floor adjacent to existing in-patient wards at institutional hospital 2015-16

Southern Railway / Engineering Department - Civil Works

1 Basin Bridge Junction – Arakkonam (Slow Line) – Train protection warning system on high density network route – construction of TPWS huts at 10 stations (BBQ, VLK, ABU, AVD, PRES, TI, TRL, KBT, TO & AJJ) 2017-18

Other Public & Private Projects

1 Touch Tel  Land Line Networks  2002-2003
2 Tata  Tele services Ltd.,  Telecom works – Laying of OFC cable from culvert No.4/4 in Manavalan Nagar – Ulandai Road to Transmission room of M/s Cater Pillar (I) Ltd., 2003-04
3 R.K.Builders Constrction of Flats 2004-05
4 Tata  Tele services Ltd.,  Telecom works – Laying of OFC cable from culvert No.4/4 in Manavalan Nagar – Ulandai Road to Transmission room of M/s Cater Pillar (I) Ltd., 2004-05
5 Tata Relief committee Construction of community rain shelter one each at Parangipettai and Killai Villages for stsunami effected victims in Cuddalore District of Tamilnadu. 2005-06
6 SPL Infrastructure (P) Ltd., Constrcuction of culverts and drains in Tiruchengode – Ariyanur Road KM 9/0 to 23/0 in Namakkal District 2005-06
7 Sri Ramachandra Constructions Construction of residential bungalow at Beasant Nagar, Chennai 2006-07
8 Tata Relief committee Construction of community rain shelter one each at Parangipettai and Killai Villages for tsunami effected victims in Cuddalore District of Tamilnadu. 2006-07
9 Tata  Tele services Ltd.,  TC Ring construction at Ambattur 2006-07
10 MS Swaminathan Reasearch Foundations Construction of Fish for all Cebter at Poompuhar village at Nagapattinam District of Tamil Nadu 2007-08
11 MS Swaminathan Reasearch Foundations Construction of dormitory block  at Poompuhar village at Nagapattinam District of Tamil Nadu 2007-08
12 Tata  Tele services Ltd.,  Medavakkam to Pallikarni connectivity 2007-08
13 Bharathi Infratel Limited Tower foundations and allied civil works over Tamilnadu 2007-08
14 BSNL Construction of equipment room cum security room 2008-09
15 BSNL Construction of temperary structure for accomidation of CC(S) in RSU compound DINROZE Chennai 2008-09
16 Mr.Sampath Construction of residential flats 2010-11
17 Mrs Malarvizhi Construction of residential building 2013-14